Monday, July 16, 2018

Shop improvements done.

Let’s pick up on the shop improvements where we left off last time. I build a torsion top to replace the old table for the mitre saw. Then add an area to extend the work surface, which will be a convenient place to add drawers to in the future. Then I get everything back in place, with a few changes along the way.


Thanks for dropping by.

Monday, July 09, 2018

Shop improvement time.

I didn’t want to start on this job, but I wanted it done. The prep work and tearing apart the shop to do work on it is always a bit of a pain. Shops are never really “done” though, so continuing on with a slow but steady stream of upgrades I finally get that last 12′ of wall in the shop done. Now it is fully insulated and sheathed on the inside. Next will be putting it all back together. Someday I hope to get the proper electrical out there. Doing it in stages and slowly means it will all be surface run when I can afford it.


Thanks for dropping by

Thursday, June 28, 2018

Roubo built part 2

Some progress on the work bench.  I earned my keep doing this, and so did my tools.